As part of an on-going enhancements, a capital improvement project was completed by Board this summer (2011). A new parking lot was built at the back of the fairgrounds. Thanks to donations, the board was able to do so with minimal cost. The Board would like to publicly thank Arch Materials, Burroughs Trucking & Excavatiing, and Roger Mahan, for their donations and allowing us to complete this project with considerable savings.